FLOWCHART FOR PLANNING PERMIT AND DEVELOPMENT PERMIT
Planning Permit Requirement
- Evidence of a right or authorization to use the land in accordance with the laws of the country;
|
- Site plan conforming to the local plan of the area;
- Block plan;
- Zoning Assessment and Justification Report if the application involves change of use or re-zoning;
- Relevant drawings where applicable;
- where applicable, reports relating to
- Air or aviation safety;
- Radiation protection;
- Environmental protection;
- Fire safety;
- Petroleum operations;
- Standard verification;
- Traffic impact;
- Geo-technical impact;
- Hydrological impact; and
- Structural
Start
Development Permit Requirement
- Evidence of land ownership
- 4 Copies of architectural drawings
- 2 Copies of structural drawings
Where applicable, reports relating to;
- (i) Air or aviation safety;
- (ii) Radiation protection;
|
- (iii)Environmental protection;
- (iv) Fire safety;
- (v) Petroleum operations;
- (vi) Standard verification;
- (vii) Traffic impact;
- (viii) Geo-technical impact;
- (ix) Hydrological impact; and
- (x) Structural
Applicants make necessary corrections.
Yes
Any
|
corrections?
No
|
Application considered by Spatial Planning Committee
|
Refused
What is the decision?
Deferred
|
Approved
Upheld
|
What is the decision?
End